Field of View
|
||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE: Vertical field of view is impacted by rain guard (P/N 10236202). The grayed out portion at left is not visible with rain guard (P/N 10236202) installed. |
|
Figure 3 Heptane Field of View
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE: Vertical field of view is impacted by rain guard (P/N 10236202). The grayed out portion at left is not visible with rain guard (P/N 10236202) installed. |
|
Figure 4 Methane Field of View
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE: Vertical field of view is impacted by rain guard (P/N 10236202). The grayed out portion at left is not visible with rain guard (P/N 10236202) installed. |
|
Figure 5 Methanol Field of View
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE: Vertical field of view is impacted by rain guard (P/N 10236202). The grayed out portion at left is not visible with rain guard (P/N 10236202) installed. |
|
Figure 6 Propane Field of View
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE: Vertical field of view is impacted by rain guard (P/N 10236202). The grayed out portion at left is not visible with rain guard (P/N 10236202) installed. |
|
Figure 7 Ethane Field of View
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE: Vertical field of view is impacted by rain guard (P/N 10236202). The grayed out portion at left is not visible with rain guard (P/N 10236202) installed. |
|
Figure 8 Butane Field of View
Response Times and Field of View data were derived by testing the FL500-H2 flame detector with a hydrogen flame from a 6 inches square custom burner with 1600 orifices. The flame height was approximately 32 inches. |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE: Vertical field of view is impacted by rain guard (P/N 10236202). The grayed out portion at left is not visible with rain guard (P/N 10236202) installed. |
|
Figure 9 Hydrogen Field of View FL500-H2 horizontal